The triple constraint, comprising time, scope, and cost, forms the foundation of our project objectives. Our primary focus in this endeavor is to ensure the timely completion of the construction within the specified nine-month timeframe outlined in the contract. To achieve this, we have developed a detailed project timeline, allocating specific project phases to different months.
The 2nd focus of this project was to achieve the target within the allocated budget. In order to ensure cost control, we conducted thorough estimations for the different materials required, enabling us to stay within the given budgetary constraints.
Moving on to the 3rd important factor, scope identification played a crucial role in this project. The scope of our undertaking was to construct a 5 Bedroom Duplex on two levels: the Ground floor and the first floor, all within the specified time and budget. The scope statement outlines the project requirements and serves as a reference for our team.
Let’s take a closer look at the dimensions and features mentioned in the scope statement for each floor:
These specific dimensions and features serve as guidelines for our construction team, ensuring that every aspect of the project is meticulously planned and executed according to the desired specifications.
S/N |
SPACE |
LENGTH X WIDTH |
SQUARE METRE |
1 |
Gazebo |
4.2m x 3.75m |
15.75 Sqm |
2 |
Car port |
6.45m x 4.7m |
30.03 Sqm |
3 |
Entrance Porch |
6.45m x 1.4m |
9.03 Sqm |
4 |
Entrance Foyer |
4.2m x 4.5m |
18.9 Sqm |
5 |
Visitors Toilet |
1.5m x 2.2m |
3.3 Sqm |
6 |
Home Office |
3.9m x 3.0m |
11.7 Sqm |
7 |
Lounge |
5.4m x 8.4m |
45.36 Sqm |
8 |
Bar |
2.4m x 1.7m |
4.08 Sqm |
9 |
Dinning |
7.2m x 4.2m |
30.24 Sqm |
10 |
Kitchen |
7.2m x 4.2m |
30.24 Sqm |
11 |
Store |
2.1m x 2.4m |
5.04 Sqm |
12 |
Laundry |
2.8m x 2.4m |
6.72 Sqm |
13 |
Guest Room 1 |
5.4m x 4.2m |
22.68 Sqm |
14 |
Guest Room 2 |
5.4m x 4.2m |
22.68 Sqm |
15 |
Electrical Room |
2.4m x 1.3m |
3.72 Sqm |
16 |
Out-door Sitting Area |
4.8m x 10.9m |
52.3 Sqm |
17 |
Stair-Rail |
4.2m x 4.5m |
18.9 Sqm |
In addition to the mentioned information, the scope statement also includes the estimated time required to complete each aspect of the project. Our aim is to adhere to the defined scope and ensure that the project is finished within the designated time and cost limits.
There are several environmental factors that may influence this project, including:
Organizational Process Assets (OPA) provide guidelines and procedures for working on this construction project. We will adhere to these procedures for future house construction projects, leveraging our past experiences to ensure successful project delivery.
The activity list for this project includes:
By following this comprehensive activity list and utilizing the organizational process assets, we are committed to delivering a successful construction project while meeting the defined scope, time, and cost objectives.
One of the significant challenges faced during the construction of the 5 Bedroom Duplex at Sabegeria was the issue of flooding. The location of the site in Sabegeria, Bayelsa State, Nigeria, exposed it to the risk of frequent flooding due to its proximity to water bodies and the region’s geographical characteristics. This posed a considerable obstacle to the successful completion and functioning of the duplex
1. Site Preparation: Adequate site preparation was carried out, including proper grading, drainage planning, and the use of appropriate construction materials that are resistant to water damage.
. Flood Resistant Design:
By addressing the challenge of flooding with site allocation, flood-resistant design, and effective water management strategies, the 5 Bedroom Duplex at Sabegeria was able to overcome the major challenge posed by floods. The successful implementation of these solutions ensured the durability, functionality, and resilience of the duplex in the face of flood-related risks, providing peace of mind to the occupants and ensuring the long-term value of the property.